← LEADERSHIP TERMINAL

DÁIL ÉIREANN · FORMER

Darragh O'Brien

Dublin Fingal East · Fianna Fáil · Ireland

IN THEIR OWN WORDS

The appropriate next time to do that is once the ANCA decision is finalised and the public consultation is concluded, which will be on 3 September. Obviously, there will be a period required after that when the submissions to ANCA will be looked at. That is where the consultation is. That will happen over the coming months.

SITTING OF 2026-07-08 · READ THE OFFICIAL REPORT

I have already mentioned the more than 3 million passengers who flew through Cork Airport and the growth of Shannon Airport, which has just had its best half a year and which now has over 40 routes. However, a small number of people are impacted and they need to be listened to.

SITTING OF 2026-07-08 · READ THE OFFICIAL REPORT

Others did not want it at all. I think Shane Ross was Minister for transport at the time. That has been done. That is in place. This decision will be made. I do not have a timeframe. Hopefully it will be soon after the submissions from the public on the draft noise decision is made. That would feed into both.

SITTING OF 2026-07-08 · READ THE OFFICIAL REPORT

An Investec report published in, I believe, 2022 said that to maintain the cap at 32 million between now and 2030 would jeopardise up to about 19,000 jobs. That is the reality of it. I support the workers in the airport. I am from the community myself. The airport has to grow in a sustainable way.

SITTING OF 2026-07-08 · READ THE OFFICIAL REPORT

I have also made it clear that even though, and this is a fact, international aviation emissions are outside the scope of the climate action plan, we are taking actions aligned with the global approach to decarbonisation of the aviation industry, which is based on the International Civil Aviation Organization's basket of measures to ensur…

SITTING OF 2026-07-08 · READ THE OFFICIAL REPORT

I have already highlighted the planning decision on the DAA’s infrastructure application. We discussed that at some length over the course of the last nearly two hours. That application seeks to raise the passenger cap to 40 million and provide for much-needed additional infrastructure at Dublin Airport.

SITTING OF 2026-07-08 · READ THE OFFICIAL REPORT

The complete record

Every one of 1,432 lines we hold for Darragh O'Brien, in date order, each linked to its source. Free to read, in full, without an account. Page 23 of 29.

  1. The programme for Government seeks to address the challenges of balancing energy needs by committing to scaling up investment in critical infrastructure and our electricity grid, which will be advantageous for customers and enhance the data centre and digital economy footprint to support continued foreign direct investment, FDI.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  2. These plans will form a vital input into system operators' submission to the price review process, which sets out the level of investment required over the next five years. That is price review, PR, 6, which we have already discussed here. The CRU is currently reviewing the proposals from ESB Networks and EirGrid in terms of their investment requirements. The submissions made to the CRU propose a significant uplift to the investment required in terms of distribution and transmission to support the requirements of a growing population and economy. The exact level of this will be part of the CRU's final determination later this year.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  3. While in the near term, already-contracted data centres will be accommodated on the grid for the medium term, the Government has committed to developing a plan that will guide the development of plan-led data centre and larger energy user infrastructure in alignment with our decarbonisation objectives and growing Ireland's knowledge-based economy and that will provide certainty for the sector over the medium term. Moreover, the electricity system operators, namely EirGrid and ESB Networks, assess the various expected future demands on the system, including in the context of economic and population growth, housing and targets relating to electric vehicles and heat pumps, as part of their network development plans.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  4. The programme for Government outlines the policy position regarding energy policy, housing policy, foreign direct investment growth and the many other goals and objectives of this Government. It reflects the balance between the many opportunities and challenges facing the country and the actions that will be taken over the lifetime of this Government. It recognises that increased and unprecedented investment and delivery in our grid and expanding our energy generation capacity is critical.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  5. It is unlikely that all those east coast wind farms will on the grid in 2030 but they should be under construction but if it is in 2031 or 2032 that they are on that will still be a good thing. If 68% to 72% of our energy is being created by renewables even by 2030, that will be significant progress. That will not hit our target but that will be going significantly in the right direction.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  6. Let us be frank about it: the offshore projects have been delayed, probably by another 18 months, because of decisions that have been made by An Bord Pleanála. An Bord Pleanála is there to make those decisions. I am not criticising it. That is just a reality. We cannot ignore that. There is still a commitment to deliver those projects. We have got to see the offshore renewable electricity support scheme, ORESS, 1 projects delivered and in construction. We will have another auction relating to onshore energy, both wind and solar, later this year that there is significant interest in. We are a leader in Europe in onshore renewables. The same will happen with offshore renewables.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  7. Let us look at the facts. We all agree that the targets were always going to be challenging but we are still focused on doing our level best to achieve them. Certain sectors have done significantly well. If we look at energy industries, there is a 21.6% reduction in emissions while it is 4.6% in agriculture, 7% in residential and 5.8% in industry. Transport emissions did increase marginally by 0.3% but emissions are now 4.3% below 2019 pre-Covid levels. We are seeing things going in the right direction but not fast enough. There are things that we can do. If we look at renewable energy, there is the 80% target to 2030. That is a significant target, even the EPA projection is that we will be at 68% of our energy.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  8. The State has not done well on offshore renewables but we have created the architecture and infrastructure to do that. Five projects off the east coast are into the further information stage in planning. A decision is to be made by An Bord Pleanála. I hope that it is responded to expeditiously. We have a major opportunity with regard to offshore renewables. We will hit aspects within our targets. The overall target is still going to be extremely challenging. It will be very difficult as outlined by the EPA, but that should ensure that we redouble our efforts to do everything we can to tackle climate change and to transition to a greener cleaner economy.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  9. I have referenced the fact that since 1990, our GDP has grown six times. Our population has increased by 50%. They are the realities that we are dealing with. That is a good thing. We also need to ensure that we continue to transition our fleet, particularly in public transport, and to invest in that. Last year, there were record numbers of public transport users. There were a total of 330 billion public transport user journeys right the way through the year and we can do more. It is a combination of that. On the land use review that the Deputy asked about, I am meeting Geraldine Tallon this week again. I expect that the review will be published in the coming weeks. It will be an important guide there as well. There remains issues on unallocated savings. It is about increasing the pace of change and increasing delivery.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  10. Unquestionably, there are major challenges with meeting the 2030 targets. Anybody can see that from the EPA projections and previous projections. It is not hopeless though, not in any way, shape or form. I mentioned specifically energy generation because that is going to be the key and cornerstone to a reduction in dependence on fossil in particular and reducing carbon emissions while securing our energy future. The reason I have gone back to 2005 is to show that these things are possible because if we look at where we were on renewables in 2005, 7% of our energy was generated through them. It is now 40%. If I use 2018 as an example, 0.6% of energy was generated through solar. Now on a good day, it is 14%. There are improvements. There are challenges in some sectors, certainly in transport.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  11. These projects boost energy security and allow greater import and export of clean power. Private wires policy, which I will introduce, is designed to unlock private investment in electricity infrastructure by allowing generators to connect directly with users. This will mean quicker connections, more clean power on the ground and less strain on our national grid. The switch to electric vehicles, EVs, is accelerating. While we did not hit our target last year and it is unlikely that the target of more than 900,000 vehicles by 2030 will be hit, we will still have a significant increase. In April, there was a 23% increase in EV registrations compared to the same time last year.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  12. A total of 40% of Ireland's electricity demand was met by renewable energy last year. This represents significant progress since 2005 when the comparable figure was 7% of our energy being generated by renewables compared with 40% last year. By 2025, Ireland has 6.5 GW of grid scale renewable electricity generation capacity, which comprises 5 GW of wind and 1.5 GW of solar. This is 13 times the 0.5 GW of solar and wind electricity infrastructure that Ireland had in 2005. We are delivering new interconnectors. The Greenlink interconnector to Britain is now operational. That doubles Ireland's interconnector capacity. The Celtic interconnector to France is on track to be completed by 2026-27. The North-South project, which is crucial, is advancing, yet delayed.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  13. However, the vast majority of people in this country back climate action and we are already dealing with the effects of climate change, so this Government's mandate and resolve around climate action is unwavering. It is important to remember that Government initiatives are working and Irish people, communities and businesses are making this change. We need to accelerate and build on that momentum. It is important to recognise those efforts across Irish society. We achieved almost a 7% reduction in emissions in 2023. We are undergoing a renewables-led energy transformation. Peat is gone, coal is on the way out by the end of this month, and renewables are now the backbone of our power mix. Electricity generation from renewables has increased fivefold since 2005.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  14. We are successfully demonstrating that a thriving economy and climate can go hand in hand. Since 1990, and it is important to look at where we have come from, our economy has grown dramatically and our population has increased by half. Over the period 1990 to 2005, emissions increased from 56 megatonnes to 70.2 megatonnes, but since the peak, Ireland has successfully reduced these emissions by 22% to 55 megatonnes, showing that, with a determined response, we can reverse these trends in the most challenging of circumstances. We have always known that meeting the carbon budgets and delivering the economic and societal transformation will be challenging. All of us recognise that.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  15. I propose to take Questions Nos. 101 and 102 together. I thank both Deputies for the questions. The latest projections from the EPA are a clear signal that, while we have made progress, we need to move faster to meet our 2030 climate targets, and that is going to be incredibly challenging and incredibly difficult. The Government is building significant momentum and the EPA's analysis will help to guide that. In particular, the next phase of the work as we accelerate delivery to meet and exceed our ambitious climate targets. Our progress in recent years provides a strong foundation for this acceleration. In 2023, for example, Ireland achieved its most substantial single-year emissions reduction on record, falling by 6.8%. This is clear evidence that policies are delivering tangible results.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  16. The Deputy will understand that, as we embark upon an accelerated programme of clearance, especially of vegetation, that has to be done in a very structured way based on surveys so we can tackle the areas most at risk first. That is what is being done. As much resources as are required to go into that, through ESB Networks and through private contractors, will be supported by the Government and finance will not be an issue in this regard.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  17. I assure the Deputy that all of us want the same thing here. I have answered Deputy Daly's question about the importance of continued and enhanced investment in our grid, in that resilience aspect and in our distribution network in particular. Our generation network was not affected as much as the distribution network because the grid in those areas was resilient, but there is a significant amount of work to be undertaken. If the Deputy has specific details, such as about the family he mentioned - I am not sure exactly where they live - I am sure they will be within the plans that are there already for clearance work and a lot of clearance work has happened already.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  18. That programme of additional works will be undertaken in advance of the winter. All of those corridors will not be cleared by the winter. If you look at the forested areas across the country, it is just not possible to do that so we are focusing on the worst affected areas and those most at risk.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  19. It is obviously depending on the tree but I am telling the Deputy we have to work on this in a very structured way. Surveys are critically important. The whole network had never been surveyed as it has been done now. While I was in the process of telling the Deputy about the extensive survey work that is being done, a lot of clearances have happened already post storm, and the Deputy will know that from his own constituency. Three years' worth of timber was affected during the course of the storm that needed to be cleared, either having been felled by the storm or needing to be attended to. What we are doing now is, the survey work is nearly completed. This is exactly what we said we would do, by the way, as well as that we would get the winter resilience plan in place and we would have more spare capacity.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  20. At the most recent energy security group meeting, ESBN presented a status update. As of 4 June, while the national programme of network inspection continues, the status of the survey regarding the prioritised portion of the network since Storm Éowyn is as follows: approximately 70% of the transmission network, or 4,994 km of 7,000 km and 98% or the 38 cabling network or 5,565 km of 5,600 km have been surveyed. I will give more information during the supplementary response.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  21. Following the storm, I brought forward a memo to Government on 5 February requiring the development of an ESB Networks winter 2025 grid resilience plan. This plan was approved by the Government on 8 April and set out the actions across key areas, including hazard removal and surveying, forestry management, materials and spares review, resourcing and innovation measures that will increase resilience of the electricity network for the winter ahead. Progress has been significant. Defect and hazard clearance is actively under way with additional timber contractors to be mobilised to tackle large vegetation clearance, ESBN continues to target and prioritise the inspection of the network in the worst affected areas, a lot of them in the north west, through the use of helicopter, drone and foot surveys.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  22. I thank the Deputy for his timely question. He will know and acknowledge that Storm Éowyn was one of the most severe weather events to impact Ireland in recent decades. At its peak, as we are all acutely aware, including the Minister of State, Deputy Dillon, and I who were dealing with it at the time - 768,000 customers were without electricity. Despite these challenges, ESB Networks restored power to most impacted customers within 72 hours. The Deputy is right, however, that many others waited for three weeks. I commend all of our teams across the country who worked extremely hard to reconnect power and communications. We must continue to strengthen the capacity of the electricity grid to withstand further extreme weather events, and a range of targeted measures are now being advanced to do just that.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  23. We need a bigger and broader discussion on that as countries like Ireland expand their renewable resource. Last year, 40% of our energy was generated through renewable resources. There are many things we can do and we will work towards them.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  24. Everyone agrees that we need substantial further investment in our grid, and price review 6 will bring that forward later this year. As part of the NDP, we are looking at other ways by which we can fund investment in our grid, which is critical to ensure we can realise the potential of more onshore and offshore renewables. Later this week, the Deputy will see a decision on the PSO, which I think will be welcomed by many. I will not pre-empt that decision but the word I have on it so far indicates it will result in a reduction in the PSO for the year to come. Ireland's energy network is different from many others. The fundamental issue is how energy prices are struck at EU level and the link to wholesale gas prices. I intend to raise that with EU colleagues at the Energy Council next week.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  25. It is crucial that we do that. The focus of the task force will be on medium- and long-term structural reform measures to address high energy costs in line with the EU action plan for affordable energy.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  26. That report will be published this week. If anyone wants a briefing on it with officials, it will be available to colleagues. It is important that people understand the risks we are trying to mitigate. I restate that the programme for Government acknowledges the growing energy price and cost pressures on households and businesses and commits to bringing forward measures to contain these costs. The Government recently approved an extension of the 9% VAT rate currently applied to gas and electricity by a further six months to October 2025. That will cost an estimated €85 million and it will be looked at again in the context of the budget. My Department has established a cross-government energy affordability task force to identify, assess and implement measures that will enhance energy affordability for households and businesses.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  27. The final cost to deliver the strategic gas emergency reserve and cost recovery model are being assessed as we progress the project through the detailed design phase, and every effort will be made to minimise the cost to consumers. The final investment decision will be subject to Government approval and will be supported by independent assessments undertaken by the financial and commercial advisory authority, NewERA, as well as the Commission for Regulation of Utilities.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  28. The emergency reserve will be in the form of a floating storage and regasification unit to be owned on behalf of the State by the system operator, Gas Networks Ireland, GNI. The standard approach for cost recovery for security of supply measures and investment to meet EU regulations is through the existing regulatory framework and is achieved over the lifetime of the asset. Identifying opportunities to minimise the impact of the cost on energy consumers is a key workstream of this project. GNI is now progressing the project through the relevant planning and regulatory structures. Given the risk we seek to address, all options to accelerate delivery of the project are being pursued.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  29. On 4 March this year, I received Government approval to proceed with the development of the State-led strategic gas emergency reserve, securing Ireland's energy system, which all would agree is essential. I will continue to take decisive action to protect Ireland's economy and citizens from the potential of a catastrophic impact on or disruption to our gas supplies. The delivery of temporary gas reserves is critical to Ireland's energy security as we continue the transition to indigenous, clean renewable energy. Crucially, the strategic gas emergency reserve will also ensure compliance with EU standards and regulation. In identifying this as the optimal approach, the Department has built upon the extensive review of the security of Ireland's gas and electricity systems published in the energy security package in November 2023.

    SITTING OF 2025-06-10 · READ THE OFFICIAL REPORT

  30. It should be a living document; a living plan. We have significant investment in our airports. I referred to the €200 million investment in Cork Airport, which is really significant. It will transform that airport. The three Ministers here - myself and the Ministers of State, Deputies Canney and Buttimer - are very supportive of our aviation sector and fully recognise the importance of the sector to our economy and our society.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  31. The cross-party group on Shannon is earnest and very supportive of further growth in Shannon. I will support it in what it needs to do. As Deputy Quinlivan knows and as has been rightly said here, the Government cannot direct airlines where to fly, but I have met with our airlines. I have met with Aer Lingus and Ryanair. I have met with Airlines for America. We have discussions with them as regards Ireland as a whole. We see that Aer Lingus's and Ryanair's commitment to Ireland is very firm. Where it makes sense to add routes, they will, and I encourage them to do that. As regards regional airports, that piece of work should be finished by the end of this year. As regards national aviation policy, I take the point made and I am taking a ten-year view. That can be reviewed along the way. It is not set in stone.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  32. I have met with Shannon Group. I have met with DAA, not just on Dublin but on Cork as well. I will meet representatives of the other regional airports shortly to go through their plans. In response to Deputy Conway-Walsh, I am familiar with the potential investment there and we want to support that as best we can. Looking at the industrial zones or commercial zones around our airports, the on-campus jobs are critical but there are also the indirect jobs. Take Dublin Airport as an example. About 22,000 people are employed directly on campus, with about 135,000 indirect jobs. As airports grow, for every additional 1 million passengers there are about another thousand direct jobs. That is how important aviation is. I will work with colleagues on this.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  33. I thank Deputy Conway-Walsh for her contribution. In response to Deputy Crowe, I want to see all our airports grow. I would like to see more flights out of Shannon, Cork and Ireland West. We see growth in all those airports as well as further projected growth this year in Cork, Shannon, Ireland West and Kerry and small growth in Donegal. For the information of the House, I am working on the preparatory work on the PSO for the Dublin-Derry route, which was a commitment in the programme for Government and one which got excellent support from the Taoiseach and the Tánaiste, particularly through the shared island fund. We are working on that. A Dublin-Derry air route in 2026 is a commitment we would like to see delivered. On an all-island and an all-Ireland basis, it is critical. I have engaged with colleagues in the North on that.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  34. I will be looking forward to all interested parties and Deputies feeding into the national aviation policy and the new plan, which we will bring forward.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  35. Shannon has the capacity to grow and accommodate 10 million passengers. Cork can grow further as well, and we want to see that happen. We want to support the airports in that regard. The Government is committed as well, in the programme for Government, to the lifting of the passenger cap at Dublin Airport. There has been a stay on that, as the Deputy knows, with the ECJ case. That stay is in place for the remainder of this year, and probably the most of next year. We are working on legislative options in that regard. I use this opportunity in the House to continue to encourage DAA to engage with the planning authorities right now, and to engage in a positive way. Aviation is a major growth sector for us. It is critically important, as an island, that we improve our connectivity in what is an uncertain world.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  36. We can support the airport through our investment in it. We will be bringing forward a regional airport programme for 2026-2030. The Shannon Airport Group in particular has put forward some specific asks in that regard, which we will consider. I expect the work on the regional airport programme to be concluded this year. As I mentioned to Deputy McGettigan, we expect the national aviation policy to be published by quarter 1 of 2026. I do not have a firm timeline on it. It is not something that should be rushed, because this aviation policy will be for the next ten years and we need stakeholder engagement on it. It is an opportunity for us as well to look to see how things can be rebalanced. It is not Dublin instead of everything else. Dublin is the 5th best connected airport in Europe. People generally treat it as a destination as well.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  37. It would have. He could have used the bike. I have answered the Deputy's colleagues earlier. We are updating the national aviation policy and we will be bringing forward a new one, on which I will need all inputs. The Deputy and his colleagues have regularly championed Shannon Airport. Shannon is a fine airport. I raise the growth in the airport since 2019. In 2019, 1.72 million passengers travelled to Shannon Airport. In 2024, the figure was 2.1 million. We are projecting a further increase this year. The Government does not, and I say this respectfully, direct airlines as to where they go; the airlines choose where they go. I met with the Shannon Airport Group, which has a very good management team. It is very anxious to secure new business. The airports have to fight for that business too.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  38. I am not being evasive; it is just that the work has started. A draft will be prepared and we will publish a draft. I expect there will be input from the Oireachtas joint committee. Stakeholders will want to make an input into that too. What we receive back will also need to be assessed in advance of us actually coming forward with the completed aviation policy. I expect that is probably going to take the rest of this year and into early next year. I would expect that but I do not have a firm timeline on it. We are still growing our airports and the aviation sector. There are new technologies and new businesses coming in as well. Ireland is highly regarded as a world leader in aviation. That still happens, but this is a process that we need to undertake. I have given a commitment to the House and to the Deputy today.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  39. The national aviation policy that we operate under is the 2015 policy. After ten years it is appropriate that this is reviewed in detail and that we bring forward not just an update but a new aviation policy that would see us good for the next ten years. This is the cycle we are looking at. We have started the work on that. In a response earlier, I mentioned to Deputy O'Hara that we will do a review and an updating of the regional airports' programme for 2026 to 2030. This will encompass aspects particularly in relation to funding and other things we may be able to do there. I am anxious that we do that but I do not want to rush it either. We will need people's input here and we will need the Oireachtas joint committee to input into it also, so I cannot give the Deputies an exact timeline.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  40. I propose to take Questions Nos. 13, 51, 90 and 265 together. A lot of Deputies have raised this matter. There are questions here from Deputies McGettigan, Cathal Crowe, Quinlivan and Pa Daly. It speaks to the importance, which all of us understand, of our aviation sector. Ireland has done extremely well from a connectivity perspective. For example, Dublin Airport is the fifth best connected airport in Europe. Dublin is being used as a hub and people can connect now through the UAE and via all the additional routes into the USA. That is a positive thing. I referenced earlier the additional capacity we have in our regional airports. Thankfully we have seen quite significant growth in Shannon and Cork airports. A large investment of €200 million in Cork Airport was announced last week by the Taoiseach.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  41. As I have told the House, the best date I have for delivery is 2027. We will certainly be keeping a very close eye on this because it will make a very significant difference to customers right across the country.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  42. I know the Deputy will be raising this issue regularly and he is right to do so because it will make a very significant difference. We will certainly be putting as much positive pressure as possible on to ensure delivery. I will be watching the timeline very closely and, as it becomes firmer, I will keep the Deputy informed. It will not be necessary for someone who is visiting to have an account to tap on and tap off. Account-based ticketing will be very useful for residents. It will allow them to see what is being spent. If you go to England and are tapping on and off with your debit card, you do not see that automatically. This is for residents who regularly use rail, bus or Luas services. It will be across all modes of transport. It is complex. I am not using that word to excuse any delays. I do not envisage delays.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  43. As the Deputy has said, it is €100 million of investment. It needs to be done correctly. The Deputy will understand that there are many checks that need to be carried out in advance of the roll-out of the ICT system. Work is well under way. I will come back to the Deputy with a firmer timeline but, to give him an indication, we are looking at 2027.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  44. I am also very anxious to see this. The Deputy is right; the Leap card is great. That is fine but, if you go to London or other parts of Britain, you can tap on or off with a debit card or credit card, which works fantastically well. When we bring in our system, it will be ahead of those in Britain and most of Europe because it will also involve account-based ticketing. I have asked for a timeline and I have engaged with the NTA. To inform the Deputy and the House, while I do not have an exact timeframe, we are aiming for 2027. In advance of questions this morning, I again met officials last night to try to get a more specific timeline for delivery because this will make a very significant difference to the passenger experience for residents and visitors alike. This is a big project.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  45. In addition, the operation of the new ticketing system will involve the introduction of new financial management processes and customer support systems and the establishment of maintenance, logistics and operational teams. All of this has to occur while the current ticketing systems continue to operate. I put all of this on the record because it shows the breadth of work that needs to be done to bring this into operation. The NTA is making great efforts to ensure this transformation and beneficial project for public transport passengers is delivered as effectively as possible. I have asked for target dates for delivery and we are probably looking at the year after next, 2027. That comes with a health warning because the ICT system must be tested to ensure it is robust.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  46. The NTA awarded an overall framework contract for the design, supply, installation and operation of the new multi-modal ticketing system to a Spanish information technology company, Indra Sistemas, which has designed, installed and operated similar systems internationally. Implementing such a major and complex system across multiple transport operators requires pretty significant co-ordination. The project involves ensuring that all payment processes adhere to the highest security standards to protect customers. Comprehensive cybersecurity verification and testing will be conducted to safeguard the system against potential threats and to ensure that customers are charged correctly.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  47. As Minister for Transport, I have responsibility for policy and overall funding for public transport. The NTA has responsibility for the development of public transport infrastructure including ticketing and technology projects. The next generation ticketing project is very significant and will provide a transformative upgrade to the ticketing system for public transport passengers in Ireland. The project will facilitate a variety of payment methods on public transport services. This will involve a new-generation account-based ticketing scheme that incorporates both mobile and card-based payments for passengers. As the Deputy outlined in his original contribution, a competitive procurement process was concluded in April of last year.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  48. I have already given the examples of Kent Station, Ceannt Station and Waterford. I have visited the rail line at Shannon Foynes Port, which is under construction and being tested right now. Good things are happening. The NDP gives us the opportunity to seek additional capital to do more things.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  49. The Minister of State, Deputy Canney, has direct responsibility for the all-island rail review. I expect that matters such as the double-tracking the Deputy has mentioned will be considered as part of that. On timetables, punctuality and reliability, the management of timetables is a matter for Iarnród Éireann. Where specific matters are raised in questions here, we note them and feed them back to the company. I am sure the Deputy does likewise for his constituents. The reliability of the train service is generally very good across all of our routes. Where issues arise, they certainly need to be addressed. The previous Government embarked on the most significant investment in our rail network across the country we have seen in decades and this Government will accelerate it. It takes time to build that infrastructure.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT

  50. That will greatly increase capacity and frequency, in particular, on that service. It needs to happen. We are being told it will commence by the end of this year.

    SITTING OF 2025-05-08 · READ THE OFFICIAL REPORT