<BR /> <BR />I know the circumstances that we are in, but my hope is that departmental officials will continue to explore these issues and find solutions so that, at the earliest point, those solutions can be delivered to my constituency and to the people who have such frustration with the lack of service.

OFFICIAL REPORT, 2017-01-24 · READ THE OFFICIAL RECORD

This situation is also prevalent in other rural areas of Northern Ireland. People in areas such as Lissummon, Ballygorman, Cladymilltown, Altnamackan, Loughgall, Mullaghglass and countless others, unfortunately, all of which are located in my constituency, find themselves in a position currently where they are provided with little or no e…

OFFICIAL REPORT, 2017-01-24 · READ THE OFFICIAL RECORD

I, with others, receive regular contact from my constituents on this issue. It is abundantly clear from the representations that I receive that the lack of broadband provision, particularly in rural areas, impacts in many ways on families and businesses that reside in various locations across the constituency.

OFFICIAL REPORT, 2017-01-24 · READ THE OFFICIAL RECORD

Madam Principal Deputy Speaker, I thank you and the Business Committee for affording me the opportunity to debate the issue of broadband provision directly relating to my constituency of Newry and Armagh. I also place on record my good wishes to you as you leave the House, and I wish you well for the future.

OFFICIAL REPORT, 2017-01-24 · READ THE OFFICIAL RECORD

The lack of high-quality broadband, for instance, has an impact on the ability of many rural businesses to function efficiently, placing them clearly at a disadvantage to other competitors in their particular field.

OFFICIAL REPORT, 2017-01-24 · READ THE OFFICIAL RECORD

I could continue to detail many more circumstances, but I want other Members to contribute and to hear what the Minister has to say. I take this opportunity to make an impassioned plea to the Minister to pursue, within a quick time frame, the network improvements that are so clearly required.

OFFICIAL REPORT, 2017-01-24 · READ THE OFFICIAL RECORD

The complete record

Every one of 1,097 lines we hold for Danny Kennedy, in date order, each linked to its source. Free to read, in full, without an account. Page 11 of 22.

  1. We therefore cannot rest on our laurels. <BR /> <BR />In November 2012, I brought a paper to the Executive that set out issues and risks associated with the governance and funding of water and sewerage services. The Executive decided to remit those issues to the Budget review group for consideration. My officials subsequently prepared a detailed briefing for the Budget review group that set out a number of options for future funding arrangements, together with more detail about the risks involved in continuing with the current system. The paper highlighted some of the continuing difficulties with the current funding arrangements and the emerging pressure on NI Water's capital expenditure budget. The Budget review group's consideration of these complex issues is ongoing.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  2. NI Water’s non-departmental public body (NDPB) status means that it does not have the freedoms and flexibilities normally available to a company. It cannot use reserves to deal with unexpected costs, it cannot raise its own capital and it has no end-year flexibility, so it must manage its capital and resource budgets to ensure no overspend and minimum underspend. That is inefficient and leads to stop/start contracting. The Executive must in turn provide NI Water with adequate resources to meet its future funding requirements. <BR /> <BR />As a result of increased investment since 2000, levels of service have improved significantly across nearly all service areas. Customer service levels have improved dramatically in the last decade, but that means that NI Water has a growing asset base that has to be maintained.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  3. <BR /> <BR />That commitment means that my Department provides over 75% of NI Water’s revenue through the payment of subsidy from the public expenditure system; 20% comes from the non-domestic sector, that is, businesses, industry and so on; and DRD pays the remaining 5% for roads drainage works that NI Water carries out. The most recent published figures are for the year 2013-14, when NI Water was paid £275·4 million in the absence of domestic water charging. In addition, £2·2 million was paid for the septic tank emptying subsidy, which is unregulated. <BR /> <BR />In giving a commitment that there will be no additional water charges for households, the Executive must also accept the consequences of that decision.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  4. There is clearly no rest for the wicked. I welcomed and carefully noted the concerns and representations that Members expressed in the early part of the debate. I particularly welcome the opportunity to debate the future funding of water and sewerage services in Northern Ireland. I also welcome that the Ulster Unionist Party amendment has been accepted by, I hope, a majority of Members who spoke and, indeed, a majority of the parties in the Assembly. I think that that underlines that the funding of water and sewerage services is a cross-cutting strategic issue with significant public expenditure implications. The Executive have given a commitment that, for households, they will ensure no additional water charges during this Programme for Government.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  5. In February 2012, the inspector recommended that a junction located east of Bellshill Road would be a more acceptable alternative. My officials have subsequently developed that. A planning application to construct that junction was granted on 3 December 2014. A vesting order for the east of the Bellshill Road junction proposal was published on 9 February 2015, and the closing date for objections was 20 March 2015. A number of objections have been received and are being assessed. The notice of intention to proceed and direction order for the scheme as a whole were published in March 2011. Vesting orders to compulsorily acquire the land required to build the dual carriageway scheme will remain in draft and will be made only when funding for the scheme has been confirmed. <BR /> <BR />That is the up-to-date position.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  6. I am grateful to the Member for her question. I can confirm that consultants were commissioned in July 2003 to examine the route between Randalstown and Castledawson and to develop a preferred line for a new dual carriageway.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  7. I am grateful to the Member for his question. By way of clarification, the Department has sought details of Mr Paschal Lynch's proposals on several occasions so that they can be assessed. However, we have been unable to review Mr Lynch's proposals as he has yet to provide those details. In order to move things on, I have agreed to have a qualitative assessment of the proposals conducted. That will be undertaken by an experienced traffic engineer with knowledge of the area to ascertain whether there would be value in progressing them. I have also taken the precaution — the Member will appreciate this — that the assessment will be managed by a different section engineer from the one who brought forward the proposals, so that we can independently assess and weigh up Mr Lynch's proposals.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  8. I am grateful to the Member for his question and his interest. He will know that I recently announced my intention to hold a public inquiry into the proposals for the York Street interchange. The scheme is expected to cost in the region of £125 million and £165 million. The public inquiry is likely to be scheduled for late autumn 2015. The proposed construction project is expected to take up to three years to complete. I know that Members of the House, members of the Committee for Regional Development and members of the Executive are keen to see whether we can make progress, because it is one of the keys to unlocking some of the congestion around Belfast.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  9. I am grateful to the Member for his supplementary. He is on public record and has submitted questions for written answer and questions for oral answer on enforcement in Coalisland and other areas. <BR /> <BR />Two traffic attendants are employed by NSL to patrol streets in Fivemiletown for enforcement reasons two or three times a week. The Member suggests that at one point there were four. If he wants me to investigate that incident, assuming it was an isolated one, I am happy to do so. Let me state absolutely that enforcement, when it takes place, is done on an even, fair and transparent basis. I can think of a great many towns other than Coalisland where there are few or no incidents or enforcement cases, and much of that is down to the good sense of people in those areas obeying the various restrictions.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  10. I am happy to confirm my belief that enforcement is fair and transparent and that the system is not politically or socially blind in any sense.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  11. I accept the Member's point. Where possible, we seek to make at least two cuts a year in rural areas and five cuts a year in urban areas. With the budgetary position at the moment, it is not possible to do that. Those issues are well known and have been debated not only in the Chamber but around the Executive table. Indeed, the Committee for Regional Development is also aware of the pressures. I need the support of colleagues in the House to ensure that adequate funding is provided to the resource budget of DRD so that these services, which are much needed and are important, can continue in the fashion that people have come to expect.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  12. I am grateful to the Member for her topical question. The Member will know that, as a result of budgetary pressures, the resource budget is under severe pressure. At the moment, we simply carry out work that is absolutely necessary. That is likely to cause problems, but it is done under my instruction that we will continue to do that at least until we see the outcome of the June monitoring situation. I am conscious that any impact will be on front-line services. <BR /> <BR />Maintenance issues cannot simply be wished away. Grass cutting, gully emptying and street lighting are all day-to-day services that the public expect and need. We need to provide those services, but we need to be adequately funded for them.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  13. The Member will know that there are variations in all these things. I am not in a position to outline that to you in detail. If you write to me, I will happily provide a more detailed answer. <BR /> <BR />There is a significant challenge. My officials will work through that challenge to address it, and they will work with groups and users to minimise the impact on front-line services. I realise the importance of those services to a great many people in rural and urban areas.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  14. I am grateful to the Member for his question. Of course, we will always seek to apply efficiencies and cost savings evenly across the board. Sometimes it is dependent on the level of service in an area, and we have to be mindful of that. Generally, however, we seek to do so.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  15. I am grateful to the Member for his interest. This will be a significant project with a preliminary cost estimate of £1·5 million. It is estimated that the project could be ready to commence in 12 months, with a further 12 months required for construction. This outline time frame will be subject to any statutory approvals, land purchase and the availability of funding. However, given the potential for further flooding at this location, the scheme will be prioritised accordingly.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  16. I am grateful to the Member. The investigatory report was presented to the flood investment planning group on 23 March 2015. The report identified a number of options to reduce the flood risk in the Toome Road and Queen Street area of Ballymena. It has been agreed that the preferred option outlined in the report should be taken through detailed design to delivery. This will now be progressed as a joint NI Water and Transport NI project and will include improvements to the storm drainage system from the Wakehurst estate, increasing the capacity of the Northern Ireland Water combined sewerage system and separation of road drainage from NI Water's combined sewer. In addition, options to introduce improvements through a sustainable drainage system will be further investigated.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  17. I am grateful to the Member. I accept some of the points that she made, but the state of the network that I inherited as a legacy from her party colleague and, indeed, her immediate predecessor, was not ideal either. Roads and the maintenance of roads have been an issue for many years, and not just during an election campaign.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  18. I am grateful to the Member for her topical question. I am aware that Slieve Gullion has become increasingly popular as a venue for tourists and for local people to enjoy their leisure. It is important that access roads to the area be properly maintained. She will know that my resource budget is under considerable pressure. We seek to maintain the network as best we can, not just in Slieve Gullion, not just in south Armagh, not just in Newry and Armagh, but all over Northern Ireland.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  19. This is likely to lead to the need for a second public inquiry on the scheme, and I can advise that it is my intention to circulate a paper on the scheme to Executive colleagues in the coming weeks.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  20. Following on from the legal challenge in 2013 to the A5 western transport corridor, four draft reports have been developed to assess any impacts on all the designated environmentally sensitive sites in the vicinity of the scheme, of which there were nine in total, and, when appropriate, mitigation measures are proposed. Public consultation on those reports concluded at the end of November 2014, and responses received will be taken into account as the scheme development progresses. The next step is the publication of the draft vesting orders and draft direction order. A new environmental statement for the scheme will be published at the same time as those draft orders. Publication of the draft orders and environmental statement will be followed by a six-week public consultation period.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  21. I am aware that there is widespread public and political support for it.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  22. I am grateful to the Member for his supplementary question and accept that there have been widespread political representations. He asked when construction will start. Obviously, we have to get through the processes from 28 April through to the deadline. The construction of the scheme remains subject to the proposal continuing to have a satisfactory economic appraisal and availability in future budget settlements. If funding is available, it is expected that construction could commence in spring 2016 and would take approximately six months to complete. I very much hope that we will continue to work successfully to provide the scheme as quickly as possible. I am aware of the long-standing arguments over 40 years. The late Harold McCusker was advocating for it when he was the Member of Parliament for the whole of County Armagh.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  23. When possible, officials will continue to liaise with utility companies to complete preliminary works in advance of the main contract. In particular, some advance work by BT is likely to commence shortly and will take a number of months to complete.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  24. I am grateful to the Member, who has been a persistent advocate, along with his party colleague Jo-Anne Dobson, in giving representation for this scheme. In particular, he has promoted it and pressed me to continue to make progress on it. Part of the vesting process system is to work through the issues with the current occupants of residential and business premises that are due to be vested in order to secure vacant possession. My Department plans to continue with that work. Six houses and a complex containing six commercial manufacturing businesses will need to be demolished. All those properties, except for one dwelling, are, I understand, owned by the same landowner, with the majority currently tenanted.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  25. The vesting order will become operative on 28 April 2015. The scheme involves the construction of 430 metres of new road between Malcolm Road and Gilford Road and the upgrading of the existing junctions between Millennium Way/Malcolm Road and Gilford Road/Banbridge Road. The new road, which also accommodates cyclists and pedestrians, will reduce congestion in the area and traffic flows through residential areas. It is important to point out that construction of the proposal remains subject to the project continuing to have a satisfactory economic appraisal and funding being made available in future budget settlements.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  26. I am pleased to confirm that the notice of making of the vesting order for the extension to Millennium Way was published in the week commencing 23 March 2015.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  27. I am grateful to the Member for his supplementary question. I do not know why I am smiling. There is a distinction between the number of people attending and the number of seats that are available. I think that the Member gets that. I do not know whether there is any creativity. Sometimes, it is difficult to ask churches to pursue creativity. It is something that I am prepared to look at, and I will write to the Member after due reflection. It may not be immediate; there are other pressing issues that he is aware of.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  28. However, a place of public worship may be signed when there is a clear road safety need for doing so or all of the following criteria are met: first, that it has a seating capacity in excess of 100 and is open for worship at least once a week throughout the year; and, secondly, that my Department is satisfied that there is obvious difficulty in locating the church building due to its location or remoteness from the main road network or where there are a number of churches in the general vicinity, particularly with similar names. In such cases, the applicant is expected to pay in advance the full cost of any signing provided, which will become the property of the Department.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  29. I can advise that direction signs are generally only used where they will benefit road users as an aid to navigation, or for road safety or traffic management reasons. The main purpose of a direction sign is to guide road users to their desired destinations via the most appropriate route at the latter stages of their journey, particularly where destinations may be difficult to find. <BR />Direction signing is therefore not normally permitted to places of public worship that are located on main urban routes or on rural A- and B-class roads.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  30. I am grateful to the Member for his supplementary question. I do not subscribe to his "pig in a poke" comment. Earlier, I quoted figures in respect of Mid Ulster Council, where 23, I think, car parks were transferred, with potential income of £200,000. I think that that is not to be sneezed at or sneered at. I trust local government to look after and to continue to maintain these assets, and I think that it will do that. I do not envisage the problems that perhaps the Member does. Work was carried out as necessary to various car parks just before transfer took place, but I have to say that, based on the record of claims against the Department for defective surfaces, I am satisfied that car parks were transferred in more-than-acceptable condition.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  31. I am grateful to the Member for his supplementary question. I can say that DFP did not withhold any income, but it did offset the surplus from car parking against the budgets for other functions that were transferring. DFP, as the funding Department for central and local government, decided on how the transfer of budgets was to be handled. It did not rest with my Department.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  32. I thank the Member for his supplementary question. Wherever the Department can assist by using its experience to benefit the new operators, we will continue to do that. As I said in my earlier answer, all councils agreed to use the enforcement officials and personnel in that method at least until the contract runs out next year. We stand open to assist wherever we can, given that the responsibility ultimately now lies with the new councils.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  33. I thank the Member for his supplementary question. All councils accepted the transfer. They also accepted that the arrangements for enforcement will continue until at least next year, when the current contract operated by the Department expires. There are policy aspects, however. I think that two councils opted not to continue to provide the special rate of five hours' parking for £1, which has been so successful in other places. That is a matter entirely for those councils.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  34. In addition, engineers carried out a special public liability inspection of the car parks and completed any work identified. <BR /> <BR />The Member will be aware that the new councils will have received budget transfers from DFP for the car parks, which included an element of funding for maintenance. His own Mid Ulster District Council took possession of 23 car parks with a net book valuation of £2·5 million, which are expected to make a profit of some £216,000. Any future maintenance of the car parks that have transferred is now the responsibility of the respective councils.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  35. My Department was not given any specific funding by the Department of Finance and Personnel to resurface or upgrade car parks in advance of their transfer to the new councils, and that remains the case. From a condition and structural integrity point of view, the car parks that transferred were deemed fit for purpose. They were inspected regularly and were in daily use up to the point of transfer. Any defects identified in the run-up to the 1 April 2015 handover were prioritised and repaired as the Department's resources permitted. <BR /> <BR />Following receipt of an additional allocation for routine maintenance in January monitoring, my Department did undertake some minor works such as the renewal of white-lining in car parks where that was deemed necessary for enforcement purposes prior to the handover to the councils.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  36. The programme also improves pupils' general cycling skills and road awareness, and their knowledge of the health benefits of cycling and walking. Ultimately, it helps to create a culture of active travel within schools throughout Northern Ireland. I thank the Member for his enthusiasm for cycling in East Antrim.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  37. <BR /> <BR />Importantly, the scheme links several schools in the area and supports my Department's Active School Travel programme, which aims to increase the number of pupils travelling to school actively, whether through cycling or walking.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  38. I am grateful to the Member for his supplementary question and, indeed, for his enthusiastic support for cycling and the cycling revolution that is well under way. I know that he is a keen cyclist. The scheme at Prince Andrew Way is a continuous 2 kilometre-long and 3 metre-wide combined footway/cycleway along the north side of Prince Andrew Way in Carrickfergus. The substantial investment of over £200,000 in the cycling infrastructure will provide a continuous footway/cycleway route between North Road and Craigs Road and will make it easier and safer for people to walk and cycle in Carrickfergus. It is in line with the Department's policy to continue to promote sustainable transport such as walking and cycling as a healthy, environmentally friendly and cost-effective mode of transport.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  39. Combined footways and cycleways have also been provided along the length of the A8 dualling scheme between Coleman's corner and Larne and on the A2 scheme between Jordanstown Road and Station Road, Greenisland. Plans are also in hand to extend the cycle route from Station Road to Trooperslane and on to Carrickfergus. <BR /> <BR />My Department will continue to deliver cycling infrastructure, as resources permit, in line with the network identified in the existing transport plans.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  40. I am committed, as the House will know, to creating a network of high-quality, direct, joined-up routes throughout Northern Ireland so that everyone can use the bicycle to make everyday journeys. I envisage arterial and quiet routes in cities and greenways between urban centres to provide links to shops, community facilities, places of education and workplaces. That will take time to develop, but my Department has already begun work to develop a bicycle network for Belfast that I hope to consult on later this year. Work will then begin on similar plans for other urban areas. <BR /> <BR />In East Antrim, I am pleased to be able to confirm, the scheme to provide a combined footway and cycleway along Prince Andrew Way in Carrickfergus is nearing completion.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  41. I am grateful to the Member for her question. I do not underestimate the challenge that is before the user groups and the operators. We have sought to apply the cuts as evenly as we can. That will be the case going forward as we seek to work with groups to address the underfunding situation. I will be grateful for any representations that the Member may wish to bring to me.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  42. I am grateful to the Member for his supplementary. I can confirm that the Department made a bid for Delivering Social Change funding of some £2 million over the period 2014-16 to extend the services of local rural community transport partnerships in the evenings and at weekends. That initiative has been included as a measure in OFMDFM's draft Active Ageing strategy, but, as yet, the Department has not received confirmation that it will receive the necessary support from those funds.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  43. I have no doubt that they are successful projects that operate very successfully in areas and provide essential assistance to people who use the services, whether for social occasions or medical appointments, especially in rural areas. Representing a rural constituency, I am aware of the importance of connecting communities and people in local areas. We will continue to seek to do that, but it is a challenge, given the budget that I face.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  44. I am grateful to the Member for his supplementary question. There is no proposal or intention by me to withdraw the services, but I face a fairly critical financial position in my resource budget. The Member will know that, the Assembly knows that and the Executive know that. I cannot spend money that I do not have. That said, we are working with providers and users to try to mitigate some of the issues on the ground, and we will continue to do that in all areas, in addition to the area that the Member mentioned.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  45. I am grateful to the Member for his supplementary. I share the concern about the potential impact. The Member has suggested that some rural community transport is being cut by one third or 33%. The effective cut in grant to rural community transport is from a baseline amount of £2·75 million to £2·4 million. That is an 11% reduction. The figure of 33% refers to the position after last year's in-year monitoring rounds are included, and the Member will know that I have been successful in previous years in supplementing the awards to the groups through the monitoring rounds. I will continue to do that as we enter the new financial year. I do not underestimate the challenge, but what I am determined to do, through my officials, is to work with the providers and the groups to see where we can minimise the potential impact.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  46. My Department will work closely with the service providers to explore ways of providing the service in a more cost-efficient manner and will seek to minimise the impact on the end user.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  47. I have tried to minimise that, and it should be noted that, during my time as Minister, I have protected the baseline budget for community transport year on year and, where possible, supplemented it with in-year funding. I have been working intensively with officials to determine how best to spend the limited resources that are available to me. <BR /> <BR />The Member will know that my Department delivers key water, transport and road services. The population relies on my Department's services 24 hours a day, seven days a week. However, I am facing £60 million of pressures in this financial year, and the scale of reduction required to meet that cannot be delivered without an impact on core services.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  48. First, I acknowledge the valuable services that the community transport operators provide to local communities and their members across Northern Ireland. Rural community transport partnerships can provide access to local essential services such as shopping, the post office or local health services, such as GPs, or they can link in with the wider public transport network to enable people to travel outside their local area. It is my intention, subject to EU rules and licensing arrangements, to continue to support those organisations. However, while I support fully the services provided by all community transport service providers, there will unfortunately be a reduction in the level of funding available.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  49. I am grateful to the Member for his supplementary question. I am not aware of those instances. If he has evidence of any cases, I would be interested in obtaining it. There is certainly no planned systematic switch-off of lights at present, even though, as he will know, the resource budget is under considerable pressure.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD

  50. I am grateful to the Member for his supplementary question. I am happy to confirm that the Department is looking at that proactively, and we have a major pilot project on that in the Banbridge and Craigavon area. LEDs for street lighting use have only recently been developed to the point where they are economically and technically viable when compared with other options, such as the more conventional sodium street lights. Until very recently, the high capital cost of LED street lights meant that their widespread use could not be justified. However, prices have fallen by more than half over the past two years, and I have recognised that the time is now right to invest in LED technology on a much larger scale.

    OFFICIAL REPORT, 2015-04-21 · READ THE OFFICIAL RECORD