Heidi Alexander
MP for Swindon South · Labour · United Kingdom
“I regularly produce a letter for the CAA setting out my priorities, and I would be happy to write to my right hon. Friend in detail about the timeline, as he requests. The Bill is also about improving safety. The Government are determined that UK airspace should remain among the safest in the world.”
“Robust systems that support our national infrastructure are the bedrock of the measures contained in this Bill, from better rights for disabled passengers and modernised airspace to slot reform and quicker enforcement of passenger rights.”
“It is not the case that noise above 5,000 feet will not be considered in airspace design changes. This is about the relative balance between noise considerations and greenhouse gas emissions.”
“Questions about airport expansion will continue to be considered separately, outside the Bill process. Despite a bad day yesterday, aviation has refused to stand still for over 100 years. The industry remains at the forefront of innovation and progress, taking every challenge and every opportunity in its stride.”
“This morning I spoke to the chief executive of the National Air Traffic Services, Martin Rolfe, who informed me that this outage was due to a technical issue at their Swanwick site. While my understanding from that is that we can rule out a cyber-attack on this occasion, I do not believe this issue was unavoidable.”
“The Bill also reinstates the Government’s ability to update or create aviation safety-related criminal offences in assimilated legislation, which was lost after our exit from the EU. That will allow safety rules to keep up with international standards while ensuring that they are enforced consistently, now and in the future.”
The complete record
Every one of 608 lines we hold for Heidi Alexander, in date order, each linked to its source. Free to read, in full, without an account. Page 12 of 13.
“The hon. Lady is entirely right to highlight the importance of decarbonising our maritime industry and ensuring that our ports have the grid connections to enable fleets to purchase new vessels, so that we can get carbon emissions down on the seas, as well as elsewhere in our economy. I would be very happy to talk to her further about what more we can do to champion that important work.”
“If the hon. Gentleman wants to trade statistics on the rail network, I can tell him that we have seen a massive increase in passenger numbers on TransPennine Express and LNER. In fact, last year we had a 7% overall increase in passenger journeys and passenger revenue overall went up from £10.6 billion to £11.5 billion, which is good news for the taxpayer and a clear sign that people want to come back and use our railways.”
“I have said repeatedly at this Dispatch Box that we see a role for open access operators when they open up new markets and add value. We have to balance that against the revenue that they abstract from the public sector operator. We cannot have a situation in which we import too much congestion on to the rail network, because there is constrained and finite capacity. I am keen to see a mixed model of delivery going forward, but I need to reduce the taxpayer subsidy going into the rail network at the moment. We are supporting—”
“I assure my hon. Friend that we are taking this issue very seriously. We are reviewing licensing authorities’ compliance with existing guidance, and we will hold those who do not follow that guidance to account. We will go further following the publication of Baroness Casey’s review, and we have committed to taking legislative action to close the loopholes in the current licensing regime to achieve higher standards of safety across the board.”
“Baroness Casey has rightly brought this issue into sharp focus, and as I said to my hon. Friend the Member for Derby North (Catherine Atkinson), we are committed to addressing it. We will work as quickly as possible and consider all options, including out-of-area working, national standards and enforcement, in seeking the best overall outcome for passenger safety.”
“My hon. Friend has been a fearsome champion for this rail investment, and I am delighted that over the next 10 years we will be spending more than £445 million on rail enhancements in Wales. I will certainly help her to secure the meeting that she requests.”
“Years of mismanagement and neglect have turned HS2 into a shadow of that vision put forward 15 years ago, but this Government were elected on a mandate to restore trust to our politics, and that is why we will not shirk away from this challenge and why today we turn the page on infrastructure failures. I can think of no better mission than delivering new economic opportunities, new homes, commercial regeneration and an upskilled supply chain, all of which HS2 can still unlock, but no one should underestimate the scale of the reset required. Passengers and taxpayers deserve new railways that the country can be proud of. The work to get HS2 back on track is firmly under way under this Government, and I commend this statement to the House.”
“Billions of pounds of taxpayers’ money has been wasted by constant scope changes, ineffective contracts and bad management. There are also allegations that parts of the supply chain have been defrauding taxpayers, and I have been clear that those need to be investigated rapidly and rigorously. If fraud is proven, the consequences will be felt by all involved. I have to be honest: this is an appalling mess, but it is one that we will sort out. We need to set targets that we can confidently deliver and that the public can trust, and that will take time, but rest assured that where there are inefficiencies, we will root them out; and where further ministerial interventions are needed, I will make them without fear or favour. HS2 will finally start delivering on our watch.”
“I have spoken about our inheritance and James Stewart’s review, so let me finally turn to Mark Wild’s initial assessment, which lays bare the shocking mismanagement of the project under previous Governments—I will place a copy of his interim findings in the Library. He stated, in no uncertain terms, that the overall project, with respect to cost, schedule and scope, is unsustainable. Based on his advice, I see no route by which trains can be running by 2033 as planned. He reveals that costs will continue to increase if not taken in hand, further outstripping the budget set by the previous Government, and he cannot be certain that all cost pressures have yet been identified. It gives me no pleasure to deliver news like this.”
“In that spirit, the Prime Minister has also asked the Cabinet Secretary to consider the implications for the civil service and the wider public sector of the issues raised in the report, including whether further action or investigation is warranted. We are wasting no time in delivering on this review. I will update Parliament on our progress through my six-monthly reports, even if the information is uncomfortable, because for a Government who last week pledged billions in capital investment for new major projects, and who believe in the power of transport infrastructure to improve lives and deliver on our plan for change, that level of failure cannot stand. We will learn the lessons of the past 15 years and restore our reputation for delivering world-class infrastructure projects.”
“The combined cost for those two failed designs, which has now been written off, was more than a quarter of a billion pounds. What is more, the previous Government announced a Euston ministerial taskforce. Unbelievably, the taskforce never met. This Government recognise Euston’s huge potential. We have already committed funding to start the tunnelling from Old Oak Common to Euston, and we will set out more details in our 10-year infrastructure strategy. We will use James Stewart’s findings to transform infrastructure delivery across Government. Implementing real change in how we deliver infrastructure is not just for the Department for Transport. This Government are committed to implementing these recommendations and adopting a new approach to delivering infrastructure, as will be set out in our upcoming 10-year infrastructure strategy.”
“The new chief executive is already strengthening the organisation, including by filling critical gaps in areas such as commercial expertise, and he will be backed by Mike Brown, announced today as the new chair. This is a new era of leadership that the project desperately needs, with Mike bringing significant experience as a former Transport for London commissioner. Mark and Mike were part of the team, with me, that turned Crossrail into the Elizabeth line; we have done it before and we will do it again. Fourthly, between 2019 and 2023 HS2 Ltd provided initial designs for Euston station coming in almost £2 billion over budget. When asked for a more affordable option, it offered one costing £400 million more than the first attempt. The word “affordable” was clearly not part of the HS2 lexicon.”
“We will stop this spiralling any further by delivering all the recommendations on cost control. That starts with HS2 fundamentally changing its approach to estimating costs. It includes certainty over funding, which the spending review has given. It also means HS2 working with suppliers so that their contracts incentivise saving costs for taxpayers; as far as I am concerned, suppliers should make a better return the more taxpayer money they save. Thirdly, the review identified a deficit in capability and skills, with a fundamental lack of trust between my Department and HS2 Ltd. I am clear that both capability and cultural issues within HS2 must be addressed.”
“The Government not only welcome the review, but have accepted all the recommendations, and my Department is already delivering on these, specifically across five key areas. First, on the lack of oversight and scrutiny, quite simply there have been too many dark corners for failure to hide in. The ministerial taskforce set up to provide oversight of HS2 had inconsistent attendance from key Ministers, including the then Transport Secretary and the then Chief Secretary to the Treasury. The Government have re-established the taskforce with full senior attendance per the review’s recommendations. A new performance programme and shareholder boards will offer much-needed oversight and accountability. Secondly, the report highlights HS2 could cost the taxpayer millions more than planned.”
“We have started the year-long task of fundamentally resetting the project, including commissioning infrastructure expert James Stewart to lead a review into governance and oversight. As part of that reset, we have reduced financial delegations to HS2 Ltd, placing a lid on spiralling costs until the reset is complete and we regain confidence, and we have supported Mark Wild’s review of the size and cost of HS2 as an organisation. But today we are going further. I can confirm we have published the landmark James Stewart review and the Department’s response. The review, commissioned in October last year by my predecessor, was a tough, independent look at how the Department for Transport and Government deliver major projects.”
“Despite the 2020 Oakervee review advising that Government halt construction contracts pending improvements in price and simpler engineering, they pressed ahead regardless. It has been no less than a litany of failure and today I am drawing a line in the sand, calling time on years of mismanagement, flawed reporting and ineffective oversight. It means this Government will get the job done between Birmingham and London. We will not reinstate cancelled sections we cannot afford, but we will do the hard but necessary work to rebuild public trust, and we have not wasted any time. Since July we have appointed new leadership of HS2 Ltd to turn this project around. We have made clear to the new chief executive, Mark Wild, that the priority is building the rest of the railway safely at the lowest reasonable cost even if this takes longer.”
“But after a decade and a half of Tory timelines planned then delayed, routes drawn up then cancelled, budgets calculated then blown and promises made then broken, we inherited a project that had lost the trust of the public, that created an image of a Britain woefully unable to deliver big infrastructure projects and that had been axed from swathes of the country it was originally meant to serve. Phase 1 could end up becoming one of the most expensive railway lines in the world, with projected costs soaring by £37 billion under previous Conservative Governments, and £2 billion of taxpayers’ money was sunk into phase 2 work before it was cancelled by the previous Government. There was also clear evidence of poor management.”
“With permission, Mr Speaker, I shall make a statement on HS2. As a London councillor over 15 years ago, I remember hearing the then Labour Government’s bold plans for high-speed rail to link our major cities, address the capacity needs of the future and, in the words of then Prime Minister, Gordon Brown, to join “the high-speed revolution sweeping the world.” It was a vision of a confident nation and a clear signal: our great towns and cities in the midlands and the north, with potential that had been untapped at best and ignored at worst, could be places of opportunity and aspiration again. That was the promise of HS2.”
“Before coming to the Chamber today, I looked up the number of Rail Ministers in the Department under his Government—it was 18 in 12 years. It is no wonder that projects such as HS2 were left in such a state of disarray. Just as this Government have returned stability to the nation’s economy, so will we return common sense and stable leadership to the delivery of the nation’s infrastructure.”
“He asked me to set out the Government’s plans for further enhancing rail connectivity in the midlands and the north. I can assure him that further announcements will be made, both as part of the Government’s 10-year national infrastructure strategy and beyond that in the weeks and months ahead. The hon. Gentleman also asked me to opine on the extent to which litigation has caused delays in the delivery of infrastructure projects. He will know that, through this Government’s Planning and Infrastructure Bill, we are tackling this issue by limiting the number of judicial reviews and legal challenges that can be brought. Unlike his party, this Government are serious about delivering infrastructure, and about providing the stable leadership that this country needs when it comes to infrastructure.”
“I can assure him that I will provide appropriate updates to the House on the progress of the HMRC investigation that is now under way. The hon. Gentleman asked me to set out our plans for investment in transport in the midlands and the north. The Conservative party took the decision to cancel HS2 north of Birmingham, and made wild promises about what it would do with the money it claimed it was saving. He is kidding himself if he thinks that that money ever existed. In last week’s spending review, this Government set out £15.6 billion to be invested in local transport schemes across the country, whether in Birmingham, Liverpool, Manchester, Leeds or Newcastle. The hon. Gentleman’s approach was a fantasy—he promised the moon on a stick and had absolutely no means to deliver.”
“I thank the hon. Gentleman for his response, and indeed for the tone with which he made his comments. I was pleased to hear him acknowledge that mistakes had been made on HS2 by the previous Government. I think he described the path as not having been perfect—I would go so far as to say that it has been a shambolic mess. He struck a sombre note in his remarks, and I would ask him to consider going further, once he has had the opportunity to read the full James Stewart report, because an apology on the part of the Conservative party for the mess in which it left this infrastructure scheme is undoubtedly warranted. I also thank him for his comments on the action that HS2 is taking with regard to alleged fraud within the supply chain.”
“I thank the Chair of the Transport Committee for her comments. She is right to recognise the excellent work that HS2 has done on skills and the workforce. We have over 300,000 people working on this project at the moment, and I think that HS2 has done good work on opening up opportunities, whether through apprenticeships for the next generation or through the supply chain. I will heed my hon. Friend’s advice about learning from the speed and ease with which other countries deliver infrastructure projects. [ Official Report , 23 June 2025; Vol. 769, c. 4WC.] (Correction)”
“I know the Rail Minister has a monthly meeting with the new chief executive. We have already held a meeting of the ministerial taskforce, and there is another one due soon. I have had multiple one-to-one conversations with the leadership team at HS2. The hon. Gentleman asks when I will be in a position to provide a full update on costs and schedule. Mark Wild has told me that he will require until the end of this year to do that full piece of work. I am not prepared to get ahead of that, because that is how we have got into problems previously. The hon. Gentleman can rest assured that as soon as I have more information, in addition to the six-monthly report that I provide to Parliament, I will come back to this House.”
“The hon. Gentleman raises three fair issues, and I agree with his assessment that the previous Government were not just asleep but comatose at the wheel. He asks whether the alleged fraud in the supply chain will be fully investigated, and whether moneys will be returned to the taxpayer. I can assure him that no stone will be left unturned in getting to the bottom of this matter. He is also right to highlight the question of poor and inconsistent attendance by individuals who held my role, the Rail Minister’s role and Treasury roles. It is imperative that politicians who have oversight of these infrastructure schemes stay close to the detail of what is happening, both through their own officials and directly with the executive and non-executive leadership of the project. That is certainly what I intend to do.”
“We are determined to ensure that everyone, no matter where they live in the country, has an excellent public transport system that they can rely upon.”
“I gently say to my hon. Friend that the Mayor of the West Midlands might have something to say about his great city being seen as the end of an extension to the London underground line. It is completely right that our two great cities—Birmingham and London—are connected with high-quality rail services. Although this is a difficult day in exposing the state of the project, I have no doubt that in time it will be a railway we can be proud of. I also say to my hon. Friend that I am aware of forecast capacity constraints between Birmingham and Manchester and in other parts of the country. We are investing, through things such as the trans-Pennine route upgrade, in improving connectivity to other great cities in the north of England.”
“It is essential that we proceed as quickly as possible with the remaining civil engineering works that will have affected the hon. Member’s constituents to date. If he wishes to write to me with details of the problem he has experienced with accessing mitigation funds, I will raise that for him with the chief executive of HS2.”
“My hon. Friend is right that certainty is critical for the rail supply chain. It will be a number of months before I am in a position to confirm with any certainty the schedule and estimated final cost. As soon as the new chief executive, Mark Wild, has provided that information to me and my Department, I will be updating the House.”
“The right hon. and learned Gentleman is right to point out that we have some form as a country in seeking to gold-plate infrastructure projects. The last Government talked about this railway being the fastest and the best in the world. Frankly, I would like this country to do things well and properly. The point he raises about compensation is one that any Government should keep under review, while bearing in mind the need to provide value for money to the taxpayer. I can assure him that I will make sure on any infrastructure project I oversee in this role that the House is appropriately updated and that we proceed with transparency on the costs and benefits of the schemes.”
“I think the biggest reassurance that I could give my hon. Friend is my cast-iron commitment to ensure that we proceed as rapidly as possible with the completion of the remaining construction works, which I know will have had an impact on his constituents. While I cannot commit myself to the provision of further compensation from the Dispatch Box today, if they are experiencing particular problems he should not hesitate to bring them to my attention and that of my Department.”
“I thank the hon. Gentleman and his colleagues on the Public Accounts Committee for the work that they have done on this over so many years. He is right to highlight the need for skills within the Government so that they can act as a strong client of HS2 Ltd. We also need to ensure that we have the right commercial acumen in HS2, and I know that the chief executive officer is working on that. I must, however, disappoint the hon. Gentleman, because I think it unlikely that in my next report to Parliament, which I believe is due before the summer recess, I will be able to provide any concrete information about a new schedule window and a new cost envelope. I think that the work will take the chief executive towards the end of the year before we are in a position to make that information public.”
“My hon. Friend has painted a graphic picture. I understand that when large infrastructure works are taking place those who live closest to them will often experience disruption in their daily lives, and I want to put on record my thanks to the residents of Kingsbury, Coleshill and Water Orton for their patience. I agree wholeheartedly with my hon. Friend that we need, once and for all, to put an end to this cycle of overspends, delays and waste, and get on and build a railway that is fit for the 21st century.”
“I can give the hon. Gentleman that assurance. This is a once-in-a-generation opportunity not only to re-provide the existing Euston station—which, I am sure, will frustrate many Members and their constituents at times—but to provide the new HS2 station there and to unlock land around it. That will enable new homes to be delivered, but is also a massive commercial opportunity for regeneration in the heart of London. It is a very exciting opportunity—one that we will be saying more about in the coming weeks.”
“My hon. Friend has asked about the possibility of opening an Elizabeth line station at Old Oak Common before the opening of the HS2 station. I will certainly speak to the Rail Minister, in the other place, and explore what the opportunities might be. If I may, I will then write to my hon. Friend. He may have heard the Chancellor announce last week, during her statement on the spending review, that we are opening and financing a structures fund to enable local authorities with assets that are costly to repair to bid to the Government for help with repairing dilapidated bridges, tunnels and so on. I will say more in due course about how the fund will operate, and I am sure that we will be talking about Hammersmith bridge again, as we have for many years.”
“The hon. Gentleman tempts me to talk about the Dawlish scheme. I must admit that it is a topic I will need to take up with the Rail Minister, and I will be happy to give the hon. Gentleman a response in writing in respect of the merits of the scheme.”
“I am sure the leadership of HS2 would be very concerned to hear that description of the way that the project is engaging with local people. That is not what I expect of an infrastructure company, and I am sure it is not what the chief executive of HS2 Ltd would want either. I would be very happy to meet my hon. Friend.”
“I am afraid I cannot give the right hon. Lady a date today, but I can assure her that I am fully cognisant of this issue. We need to look at whether there is any requirement for any future schemes. As soon as we are in a position to provide updates, I will come back to this House and be sure to provide hon. Members will all the relevant information.”
“I can assure my hon. Friend that we are determined to see the main works civil engineering contracts completed as soon as possible. That is the element of construction that generally creates most disturbance for local communities, and we are pretty much at peak construction now. I thank her constituents for their patience while we continue to deliver this vital new piece of rail infrastructure.”
“We are not going to be a country that spends over £30 billion on rail infrastructure but then never sees a train running on it. We have already seen too much waste, and I am interested to hear that the hon. Gentleman is advocating more. We also have significant capacity constraints between Birmingham and London. He seems not to want to do anything about that, but I think those two great cities deserve a railway that is fit for the 21st century; I am just sorry that he does not.”
“I share my hon. Friend’s anger. He is a powerful advocate for his constituents, who have endured disruption, and I agree entirely that the way this project was handled was a dereliction of duty on the part of the previous Government. That is why we have appointed new leadership, why we are accepting all the recommendations of the James Stewart review, and why we are going through this fundamental reset. As soon as I have received advice from the new chief executive about the revised cost and schedule, I will update my hon. Friend and other hon. Members.”
“There are challenges across the rail network, and I readily accept that improvements are needed in many parts of the country. I do not necessarily accept that the south-west is the poor cousin of the rail network, but I can assure the right hon. Gentleman of my determination to make sure that everyone, no matter where they live in this country, has a better rail service at the end of this Parliament than they did at the beginning of it.”
“We have appointed new leadership. We are establishing new governance. We are looking at the incentives contained in the contracts on the civil engineering works. We will make sure that no stone is left unturned in providing value for money for the taxpayer on HS2, because this country is making a very significant investment and we need to ensure that every penny is wisely spent.”
“The right hon. Lady may have heard the Chancellor announce in the spending review over £400 million of investment in the Welsh railways over 10 years. That will enable work to take place on the Burns stations in south Wales, and at Padeswood sidings on the north Wales line. It is a significant investment in Welsh railways, the like of which has not been seen for many, many years.”
“I can assure my hon. Friend that the Government 100% recognise the need to improve rail connectivity in the midlands and the north. He is also right to highlight the need for a stable pipeline of investment, so that the supply chain can plan, and so that we do not lose skills. The Government have an ambitious rail programme; there is East West Rail, the trans-Pennine route upgrade and HS2. I am determined to build on this country’s proud railway heritage and ensure that we have railways fit for the modern day.”
“Dawlish is a very beautiful part of the country, so I am very tempted to take the hon. Gentleman up on his invitation. This is the second time in this statement that the Dawlish programme has been raised. I gave the hon. Member for Newton Abbot (Martin Wrigley) an undertaking that I would speak to the Rail Minister on that subject and then write to him; I will come back to the hon. Member for Torbay (Steve Darling) in writing at the same time.”
“We have a really important programme of work across all arms-length bodies of the Department for Transport, including the DVSA. It is really important that we provide public services in an efficient and effective way. I am conscious that my hon. Friend’s constituents and others may be very keen for rapid progress on driving test wait times. I can assure him that the issue is a focus of discussions that I am having with the DVSA.”
“We are exploring finance options for the lower Thames crossing. On Monday we announced that there would be £590 million of public funding this year to take forward utility works and some land purchases. I will say more to this House in future about the private finance arrangements that we are exploring.”
“As I said in my statement, the Prime Minister has asked the Cabinet Secretary to investigate whether the James Stewart report raises any questions for the civil service or the wider public sector. My hon. Friend is completely right to highlight the point about contracts being signed with construction companies even before the scope of the works had been agreed. It is little wonder that the country has ended up paying more. We signed a contract with a company to deliver works, yet there was no clarity whatever about what work the Government wanted them to do. This is a dreadful and woeful failure of oversight by previous Government Ministers, and I will not allow that to happen on my watch.”
“I am aware that the Mayor of the West Midlands and the Mayor of Greater Manchester have put proposals to the Government on this issue. In the mid-2030s, we are likely to see severe capacity constraints between Birmingham and Manchester. We are reviewing those proposals, and I hope to be able to say more on them in the months ahead.”