← LEADERSHIP TERMINAL

UK PARLIAMENT · SITTING

Robert Jenrick

MP for Newark · Reform UK · United Kingdom

IN THEIR OWN WORDS

Robert Steele was a beautiful four-year-old boy who died three weeks ago in Newark when he was thrown from an off-road bike that was being driven by a 24-year-old man. This is the culmination of a number of incidents in my town, and many others across the country, involving off-road bikes, e-bikes and e-scooters.

BUSINESS OF THE HOUSE · 2026-09-10 · READ IN HANSARD

The Minister said that Governments are elected to lead. Most people would assume that means that Ministers are elected to lead, because they are accountable to Parliament and to the people.

TOPICAL QUESTIONS · 2026-09-10 · READ IN HANSARD

There is an air of total unreality hanging over this debate. Successive Governments have run down our Royal Navy to its present enfeebled state, they have conspired to surrender other British sovereign territory and we have a Government who procrastinate about signing off a new oil field in the North sea—let alone about one in the south A…

FALKLAND ISLANDS: SOVEREIGNTY · 2026-09-08 · READ IN HANSARD

I welcome the right hon. Gentleman to his position. I have known him for a long time—I wish him well. He has a huge task ahead of him. Earlier in the summer, the Prime Minister said that walking the streets of Makerfield lodged in his mind that so many working people want to see the personal allowance raised.

ECONOMIC GROWTH · 2026-09-08 · READ IN HANSARD

Imagine that you are a worker at JLR worried about your future, and you have the misfortune of watching the Chancellor’s speech, which contains searing economic insights like, “I want to see businesses make a profit.” There was nothing about scrapping electric vehicle mandates, bringing down energy costs by getting rid of net zero targets…

ECONOMIC GROWTH · 2026-09-07 · READ IN HANSARD

The sight of the Government escorting illegal migrants into Portsmouth harbour, the home of the Royal Navy, was a national humiliation. Sometimes I wonder whether Members of this House have no appreciation of the level of anger there is in the country at the rapes, the murders and the billions being wasted that should be being spent on th…

DOVER AND PORTSMOUTH: PROTESTS · 2026-09-07 · READ IN HANSARD

The complete record

Every one of 4,906 lines we hold for Robert Jenrick, in date order, each linked to its source. Free to read, in full, without an account. Page 63 of 99.

  1. I will give way in a moment, if I may. The strategy that we published in 2018, backed at that time by a £100 million package, is a vital step towards our shared goal. The strategy is built around three pillars: first, preventing rough sleeping before it happens; secondly, intervening at crisis points; and, thirdly, helping people to recover with flexible support that meets their needs.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  2. I will come on to the strategy. I know the Good Shepherd centre’s work; in fact, I volunteered there as a child, growing up in Wolverhampton. The centre of our work is our rough sleeping initiative. That involves our team of rough sleeping advisers working closely with local authorities to deliver vital services to help people who are sleeping rough. I take the opportunity to pay tribute to those local authorities, and the charities and organisations and their volunteers, who are taking part in the RSI. Our evaluation concluded that the rough sleeping initiative was working. It is seeing an almost one-third reduction in vulnerable people sleeping rough in those areas that are funded by the initiative, compared with what would have happened if those areas had not been part of the initiative.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  3. I think I have answered that question. We do not recognise some of the figures that we have heard. In fact, the evidence that I have seen has suggested that rent arrears have fallen over time in the case of those individuals who have moved on to universal credit. To support the rough sleeping initiative programmes such as those that I have visited in recent months, I allocated this week up to £112 million to fund the programme for a third year. That represents a 30% increase in funding for this already proven successful programme. Councils, charities and organisations throughout the country will be able to use that money to fund up to 6,000 new bed spaces and 2,500 rough sleeping support staff.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  4. As the hon. Lady may know, we are reviewing the Act; we are very aware of that and want to see it changed. We are determined to build on the work of our Housing First programme pilots, which we have already heard about. The pilots, in Greater Manchester, the west midlands and the Liverpool city region, have already helped more than 200 people off the streets and into a home and provided each with a dedicated support worker. A further 800 people are due to benefit by the end of the programme.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  5. I can assure the House that as we progress and develop our rough sleeping strategy we will do everything we can to co-ordinate it with the Department for Health and Social Care.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  6. Recent figures also show that 80% of rough sleepers who died in London had mental health needs. The data is very clear: people sleeping rough with a mental health condition are significantly more likely to die than those without a mental health need. We must not forget that behind each statistic is an individual with their own story. They all deserve the support we can give them. That is why my Department is now working closely with the Department for Health and Social Care to ensure they get the support they need. That support includes £30 million in funding from NHS England to support specialist mental health services and £2 million to help test different models of community-based healthcare, particularly focused on substance misuse and mental health treatment.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  7. The hon. Lady makes an important point. Anybody who has spent time meeting rough sleepers, particularly those who slept rough for a longer period, will know that a dog can be an incredibly important companion, and it is true that a large proportion of shelters do not take individuals with pets, although some do—in fact most of those I have visited recently, particularly in central London, allow them. Nevertheless, I would encourage shelters to find a way through this problem, because it is a significant issue. I turn now to the issue we have already discussed around health and the underlying causes of rough sleeping. In 2018, 41% of the rough-sleeping population in London were assessed as having a drug dependency need, 42% as having an alcohol dependency issue, and 50% as having a mental health support need.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  8. Our commitment to increasing the housing supply means that we will go even further than that, delivering, on average, more affordable homes each year than the last Labour Government—and there is more to come, with 250,000 more new affordable homes due to be delivered by March 2022 through the affordable homes programme, which we have boosted with a further £9 billion. In our manifesto we committed ourselves to a further affordable homes programme, which I hope will be even more ambitious. That commitment is underlined by our manifesto pledge to publish a social housing White Paper, which will set out more measures to empower tenants, provide greater redress and better regulation, and improve the quality of social housing.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  9. It requires public authorities such as our prisons, our emergency departments and Jobcentre Plus to refer service users who they think may be homeless, or threatened with homelessness, to a local housing authority of their choice. That is a clear example of public services working closely together in the interests of the most vulnerable in our society. We are also taking decisive action on the delivery of fairer, more affordable housing of all tenures, so that we can prevent and reduce homelessness and rough sleeping. The Government have delivered more than 464,000 affordable homes since 2010.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  10. It means that everyone, not just those deemed a priority, can get the support they need to prevent them from becoming homeless. The legislation also means that people can access support earlier, with new duties on public bodies, from the NHS to our prisons, to intervene earlier, and councils are now providing support of up to 56 days, ahead of someone needing help finding secure accommodation. Since the Act was implemented, more than 130,000 households have had their homelessness successfully prevented or relieved, and nearly two thirds of the applicants receiving help have been single households who previously would have been less likely to have been offered support. The duty to refer, which came into force in October 2018, is also encouraging strong local partnerships.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  11. As I have said, we are increasing funding for this issue. We are spending £1.2 billion. This year, we are adding £430 million and more—for example, the £112 million I have devoted this year to the rough sleeping initiative. That is a 30% increase, and the funding the previous year was more than the year before that, so the Government are giving this national issue the resources it deserves. I hope that meets with approval across the House. We are also taking action by implementing the Homelessness Reduction Act 2017, which will play a crucial role in tackling this issue. I pay tribute to my hon. Friend the Member for Harrow East (Bob Blackman) and all those who played an instrumental role in taking this ambitious legislative reform forward.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  12. We have a clear plan—backed by substantial investment and a proactive approach, and widely welcomed—to tackle homelessness and end rough sleeping for good. As the Prime Minister has made clear, that is an absolute priority for him and for this new Government. We are encouraged by the progress that we have made on rough sleeping in the last two years, and through measures such as the Homelessness Reduction Act 2017, the Housing First pilots and the rough sleeping initiative we are seeing results, but we know that we have to go much further to give some of the most vulnerable people in our society the future they deserve. I believe we can do this; I believe we must do this; and, as a compassionate, one nation Conservative Government, we will not rest until we achieve it.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  13. I should be happy to meet the hon. Gentleman. He will not be surprised to hear that we have already met a range of stakeholders, including representatives of Shelter and other important organisations, to discuss this issue. We want to ensure that the social housing White Paper does the job that is required, and we are working closely with organisations such as Grenfell United to learn the lessons of that tragedy. We are also working with organisations such as Shelter in connection with our renters’ rights Bill, which will bring an end to no-fault evictions and create other important initiatives, including a lifetime deposit which will help those on low incomes and others throughout society by making it easier and cheaper for tenants to move.

    HOMELESSNESS · 2020-01-29 · READ IN HANSARD

  14. I beg to move, That this House has considered the Grenfell Tower Inquiry’s Phase 1 Report. It is now over two and a half years since the tragic fire at Grenfell Tower, and I believe I speak for all Members of this House when I say that we once again offer the 72 victims, the bereaved, the survivors and everyone affected our profound condolences. They remain in our thoughts and prayers. They seek answers, accountability, justice and action to ensure that this terrible tragedy is never repeated. That is why yesterday I set out our immediate plans to improve building safety in this country. Getting this right is a priority for this new Government and the Prime Minister, and it is something that I will personally be taking forward at pace.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  15. It is the responsibility of building owners to take a view of building safety through an independent assessment of risk in that building that bears in mind all the characteristics of the building, whether it be the height, the residents in the building, the fire safety system or—as with the fire in Barking—balconies and other materials that are used on the building.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  16. I will come to that issue in a moment. The right hon. Lady and I have worked together on this and she has been a strong advocate for her constituents after the fire in Barking. The announcement we made yesterday goes further. It says that we will be working with experts to develop a far more sophisticated measure of safety in buildings than simply the crude one of height alone that has existed for decades in this country. Once we have arrived at that, it will inform all the actions that building owners will have to take.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  17. The report made very important recommendations, including new duties for building owners; operational changes for the London Fire Brigade and, indeed, for fire and rescue services more widely, as well as for emergency services across the country; and addressing the continued presence of unsafe cladding on buildings.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  18. Their voices are being heard, and they must continue to be. On 30 October last year I stood in the House with the Prime Minister following the publication of the Grenfell inquiry’s phase 1 report, which covered the events of the night. Our immediate response was to accept in principle all the findings of the report that relate to the Government. Since then, we have worked at pace to deliver the Government’s response, which I am setting out today. Sir Martin’s report provides a detailed, minute-by-minute account of what happened on the evening of 14 June 2017. It is built around the testimony of survivors and of the fire and rescue team involved in the response.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  19. If I could perhaps make some progress, I will come to the points around building safety in a moment and return to the hon. Member for Manchester Central (Lucy Powell). As I have said, getting this right will be a priority for the Government, for the Prime Minister and for myself. We will be introducing two Bills: one to deal with the immediate fire safety issues that we have identified, and another that will bring in the biggest change to building regulations in almost 40 years. Having met families of the bereaved and survivors, some of whom join us in the Gallery today, I remain acutely aware of our responsibility to ensure that they continue to receive the support they need and to see the change that they rightly demand. They have shown incredible resilience and acted not just with great dignity but with great courage.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  20. This means that they must assess the risk and they must take precautionary measures to keep people safe. The fire safety Bill will also make clear the enforcement powers that can be taken locally against building owners who have not remediated unsafe ACM—aluminium composite material— cladding. This Bill will be the first step towards the new regulatory framework that will implement the recommendations of the Grenfell Tower inquiry phase 1 and the regulatory requirements to do so.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  21. If I may, I will come to my hon. Friend in a moment. I will now turn to the actions the Government have taken since receiving the report. First, in response to Sir Martin’s findings that there was compelling evidence that the external walls on Grenfell Tower were not compliant with building regulations—this was an important finding—we are wasting no time in addressing this. The Home Office will introduce the fire safety Bill in the coming weeks so that the necessary changes are made as soon as possible. This Bill will leave building owners in no doubt that external wall systems, including cladding, and front doors to individual flats in multi-occupied residential buildings fall within the scope of the Regulatory Reform (Fire Safety) Order 2005.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  22. That will depend on the exact legal relationship in the building in question, and I am very happy to work with the hon. Lady to help investigate that. It is the responsibility of building owners to take action and, as she rightly mentions, many have for various reasons passed that on to leaseholders. I am acutely aware, as I said in the House yesterday, that some leaseholders feel trapped and unable to fund the mediation works that now need to happen, and that costs should not be a bar to that. As I said yesterday, we are now working with the Treasury to see if there are ways of providing financing to support those individuals.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  23. If the Government can assist in that, I think we should do so, because we want to see this cladding removed as soon as possible.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  24. I cannot give the hon. Lady an exact timetable, but it is worth saying that we have already—I will come on to this in my remarks—made available £600 million for building owners in both the social sector and the private sector. On expert advice, I have targeted that public grant funding towards ACM-clad buildings of over 18 metres. I will say again that all of the expert opinion I have seen has confirmed the decision that those are the most unsafe buildings and that they should be the priority for public funding. A number of building owners are already helping to remove cladding in their own buildings, and coming up with funding arrangements to help leaseholders to meet those costs, such as low-cost or zero-interest loan schemes.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  25. I would be happy to take up the individual case raised by my right hon. Friend, and the wider point. We are working closely with the insurance industry. This issue involves a range of materials, the most dangerous of which is ACM cladding, which was on Grenfell Tower. That has been the focus of public money. It is the responsibility of all building owners to have an independent assessment and ensure that the building is safe—it sounds as if that is what happened, perhaps belatedly, to the building in my right hon. Friend’s constituency. That assessment should provide the answers, after which remediation work, if necessary, needs to happen at pace. If I can help to support that in any way, I will.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  26. The question at the heart of my hon. Friend’s remarks is what the judge will determine in the second phase of the inquiry. What went wrong that led to that cladding being on Grenfell Tower? Was it a failure of Government or of regulation of the construction industry, or a combination of those things? I do not think we can prejudge what the judge will determine over the course of the detailed second phase of the inquiry that is about to commence.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  27. I pay tribute to my hon. Friend who is a long-standing campaigner on this issue. Next month we will publish the final result of the testing process that my Department has been undertaking over many months with the Building Research Establishment. That will lay out for all to see evidence that I have already seen about the safety, or otherwise, of a range of different materials. I believe it will demonstrate that ACM is by far the most concerning material and should come off buildings as quickly as possible.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  28. My Department has already introduced a ban on combustible materials on the external walls of new buildings over 18 metres, and, as I have said, made available £600 million in Government funding to support that work. Sir Martin’s report concluded that it was not just the materials of the building that contributed to the tragedy: more people could have survived the fire had the London Fire Brigade conducted a full evacuation earlier in the night. He recognises existing Government guidance stating that fire and rescue services should have contingency plans for when a building needs full or partial evacuation, and noted that the London Fire Brigade policies were in this respect deficient.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  29. I had better make some progress, but I will return to my hon. Friend in a moment. The Bill we will bring forward later this year will be the first step towards the new regulatory framework that will implement the recommendations of the phase 1 report’s legislative requirements. Under the Bill, building owners and managers will be required to share information with fire and rescue services on external wall systems, and undertake regular inspections of flat entrance doors. The Home Office will consult on the detail of the proposals in spring this year. That legislative action will address many of the inquiry’s recommendations and forms part of the wider Government response to ensure that action is taken against unsafe cladding.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  30. While these recommendations are not aimed directly at the Government, clearly the Government have a role and we will not sit back.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  31. We know that fire and rescue services across the country need to have the training and processes in place to be able to respond as effectively as possible to fires in residential buildings. The control rooms that co-ordinate emergency responses must have the processes in place to deal with all incidents effectively. I am pleased that London Fire Brigade has already rolled out fire survival guidance training, and is reviewing its policies and guidance in the light of the inquiry’s recommendations. It is important that all our emergency services have proper protocols in place to ensure that they can work together and communicate effectively in an emergency. The Home Office is working with the interoperability board to ensure that those lessons are learned.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  32. In fact, Sir Martin highlighted that effective compartmentation is likely to remain at the heart of fire safety and the response to fires in high-rise buildings. I think that that is an important point that we should all bear in mind in how we communicate on these issues to members of the public. A number of recommendations made by Sir Martin were for the London Fire Brigade, and for fire and rescue services more widely across the country. The firefighters serving that night showed exceptional bravery and dedication. I would like to pay tribute to their courage, as my right hon. Friend the Prime Minister did last year. However, the report made very clear that there were failures in the London Fire Brigade’s response. Significant changes are needed in its policies, guidance and training, including on evacuation procedures.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  33. I will come on to that point in just a moment, if I may. Sir Martin recommended that the Government produce national guidelines for carrying out the evacuation of high-rise residential buildings. I am now working closely with colleagues in the Home Office on those guidelines. My Department and the Home Office have formed a steering group with the National Fire Chiefs Council and other experts, which met for the first time in December. The group agreed on the scope of an evidence review into “stay put” and evacuation. Let me reiterate, however, that the advice from the National Fire Chiefs Council is that “stay put” remains an appropriate policy providing compartmentation is maintained.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  34. We took immediate action in the aftermath of the fire with a comprehensive and independent review of building safety, chaired by Dame Judith Hackitt.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  35. There have been some welcome developments, including, for example, that the London Fire Brigade now carries smoke hoods on its fire engines; that five pumps and a drone, rather than four pumps, are now deployed to fires in high-rise buildings; and that the London Fire Brigade has already taken steps to ensure that personnel understand the risk of fire taking hold in external wall systems. My hon. Friend the Minister for Crime, Policing and the Fire Service will address the House at the end of the debate on the work he is doing with the sector. The work I have outlined shows the urgency with which we are addressing Sir Martin’s recommendations. The Government did not wait for the phase 1 report to begin addressing the most pressing building safety issues.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  36. My right hon. Friend makes a series of extremely important points. Those issues have been brought to the attention of all the emergency services; they are now working through them. The Home Office is helping to co-ordinate that work and, like her, I hope that those lessons are learned as quickly as possible so that if we are ever presented with a tragedy on this scale again all the emergency services can work together as one, in a co-ordinated way. Fire and rescue services need urgently to address these issues and must set out their plans to do so.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  37. It will oversee a new and more stringent regime for high-rise buildings and for higher risk buildings more generally. Non-compliance is an issue in the industry, and the building safety legislation announced in the Queen’s Speech will ensure that the new regulator has the appropriate powers to sanction those responsible. This is a new and significantly tougher regime, underpinned by improved enforcement, dedicated to ensuring that our buildings are made with the necessary high safety standards and that the people within them always feel safe.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  38. I want that work to proceed at a pace that we have not known before. As I said yesterday, we are now commissioning an independent building safety construction expert to advise my Department on how we can get that moving very quickly. It was clear to me when I became Secretary of State—this was confirmed by Sir Martin’s report—that we need to go further to bring forward a series of very significant reforms and ensure that the work moves at pace. In response to Dame Judith Hackitt’s report, we are creating, immediately, the new building safety regulator. As I announced yesterday, we have chosen that that will be established within the Health and Safety Executive. The new regulator will raise building safety and performance standards.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  39. We are working very closely with the social sector and private owners. I am afraid that, frustratingly, progress has been extremely slow, as my hon. Friend and others across the House know. The fund that we opened for the taxpayer to pay for the remediation has so far seen only four successful applications. However, there is evidence that progress is moving at a pace that we have not seen before. There are now only 10 buildings in the private sector that have not begun the process of remediating, which means drawing up a plan and beginning with or contracting workers who can come on site and take away the cladding. There are exceptional circumstances with all those 10 buildings because, unfortunately, they have been identified only recently as having ACM cladding, so they have come to the process only over the course of the autumn.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  40. We owe it to them to ensure that their views are heard throughout our work, that justice is delivered and that the system is changed so that such a tragic fire can never happen again. That means reforming our building safety regime, but it also means reform of social housing to ensure tenants’ voices are heard and that their landlords provide good-quality, safe accommodation with strong and robust sanctions in place to hold them to account where that does not happen. The Prime Minister and I have committed to bringing forward a social housing White Paper. This will set out further measures to empower tenants, hold social landlords to account and support the continued supply of social housing. This will include measures to provide for greater redress and better regulation and to improve the quality and safety of social housing.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  41. As I have stated, I have had the privilege of meeting survivors and their families and friends as well as people from across the community of north Kensington, and from the schools, such as Kensington Aldridge Academy and St Francis of Assisi Catholic Primary School, that provide a safe and caring space for children affected by the tragedy to reflect and remember their loved ones, to the worshippers at the Al-Manaar north Kensington mosque, who came together to support the community after the fire and continue to do so. One thing has been clear to me: this is a community of people who look after one another, who will continue to support one another and who will never forget what happened on the evening of the fire.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  42. Yesterday, I announced a series of new measures, including the appointment of a construction expert, to quicken the pace of the remediation of ACM cladding. I announced that I was minded to lower the height requirements for sprinklers in residential buildings from 18 metres to 11 metres, and I will set out a full proposal on how we intend to deliver that in February.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  43. Of the households who lived in Grenfell tower, 10 are yet to move into permanent accommodation. Of them, one is in hotel accommodation; the others are in high-quality temporary accommodation. Without going into the personal details of each household, which would not be appropriate, I can tell the House that I have personally reviewed the circumstances behind each of them, and my right hon. Friend the Housing Minister and I have worked closely with Kensington Council to review them again several times since coming to office. They are complex cases with a range of individual circumstances behind them, but we are hopeful that many of them will move into accommodation in which they feel comfortable as soon as possible.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  44. The hon. Lady makes several important points. Much of the work of the social housing White Paper will apply to private leaseholders, and of course we have a separate stream of work on reforming leasehold. We have already said we will shortly publish a draft Bill on leasehold reform, and we await the further reports from the Law Commission and then in time from the Competition and Markets Authority on leasehold, which will inform our work and I hope lead to significant legislation to reform the leasehold market later in this Parliament.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  45. Next week, phase 2 hearings will begin as the work of the inquiry continues. Those hearings will help us to understand how the building was so dangerously exposed to the risk of fire. I have no doubt that Sir Martin will leave no stone unturned in his work. There will be tough questions for those involved in the refurbishment of the tower, and for the manufacturers of the materials used; but there will also be questions for central and local government to respond to, and I will support the work of the inquiry in any way I can. We also continue to work alongside others to bring about changes that will protect the public, and I will ensure that further updates on the steps taken to implement the chairman’s recommendations are shared with the House at the earliest opportunity.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  46. I am grateful for their engagement and commitment. It was at their request that we did not rush to publish the social housing White Paper, but are continuing to work with them to ensure that they will—I hope—be able to support it in due course. I will report back to the House shortly with our conclusions. We know that for the families, the relatives and the survivors, change cannot come quickly enough, and we know that there is still a huge amount to do. We have heard that already, in the opening of this debate. The recent fire in Barking and the fire in Bolton at the end of last year only serve to remind us of the urgency with which we must act, and will continue to guide our work. Phase 1 of the inquiry was just the first part of a complex process to uncover the truth of what happened.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  47. I did look into that issue when the right hon. Lady raised it after the fire in Barking. I am acutely aware of the number of individuals who do not have household insurance—that was brought home to me after the floods in Doncaster last year, when we encountered many households that did not have it. I do not think that it is for the state to intervene—I am not sure how practical it would be for household insurance to be provided centrally, regardless of the value of the contents of individuals’ homes—but I am happy to think again, and to speak to the right hon. Lady if that would be helpful. My Department continues to hold regular meetings with the crucial stakeholders, including Grenfell United, to discuss our emerging proposals, and to ensure that the reform we are introducing is what is needed to deliver meaningful change.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  48. I will certainly make that commitment to the bereaved, to the survivors, and to the community of north Kensington. I have met a number of those groups on a number of occasions since becoming Secretary of State, and last week my right hon. Friend the Prime Minister and I met a group of survivors, bereaved people, local residents and members of the community. I think that I speak for the whole House in once again offering the bereaved and the survivors our most profound condolences. Their pain and loss were unimaginable to us. We owe it to them, and to all whose lives have been affected by the fire at Grenfell Tower, to match these sentiments with action, on a scale and at a pace commensurate with the tragedy, and to do everything in our power to ensure that this never happens again.

    GRENFELL TOWER INQUIRY: PHASE 1 REPORT · 2020-01-21 · READ IN HANSARD

  49. Through the reforms that I have outlined today, I want to make it clear that this Government will not falter in doing whatever it takes to ensure that all buildings and all residents are made safe. I commend this statement to the House.

    BUILDING SAFETY · 2020-01-20 · READ IN HANSARD

  50. The proposed Bill will place beyond doubt that external wall systems, including cladding and the fire doors to individual flats in multi-occupied residential blocks, fall within the scope of the Regulatory Reform (Fire Safety) Order 2005. These changes will affirm the ability to enforce locally against building owners who have not remediated unsafe ACM buildings. Building owners and developers who have not already taken action must do so now. Further delay is not acceptable. Finally, I am aware of the concerns of leaseholders about meeting the cost of remediation. As I do not want cost to be a barrier to remediation, I am considering, with Her Majesty’s Treasury, options to support leaseholders. My right hon. Friend the Chancellor and I will set out further details in due course. The safety of people in their homes is paramount.

    BUILDING SAFETY · 2020-01-20 · READ IN HANSARD